Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 423123.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $2,000.00
Issuance Date: 10/29/2012
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/30/2012
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 11/15/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2012 | $2,000.00 | 10/30/2012 | Serious | |
Penalty | Z: Issued | 10/29/2012 | $5,000.00 | 10/30/2012 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.451(f)(7): Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person. Jobsite - 2000 Parrish Street - The tubular welded scaffold was not erected, moved, or altered under the supervision and direction of a competent person. Employees were exposed to numerous hazards including falls, being struck-by materials, and electrical contact while performing their work activities. On or about 04/30/2012.