Violation Detail
Standard Cited: 19100305 G01 IVA Wiring methods, components, and equipment for general use.
Inspection Nr: 315860635
Citation: 01005
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,550.00
Current Penalty: $1,913.00
Issuance Date: 11/08/2011
Nr Instances: 6
Nr Exposed: 5
Abatement Date: 12/02/2011
Gravity: 01
Report ID: 0213900
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/05/2011 | $1,913.00 | 12/02/2011 | Serious | |
| Penalty | Z: Issued | 11/08/2011 | $2,550.00 | 12/02/2011 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard: REFINERY
29 CFR 305 (g)(1)(iv)(A) Flexible cords and cables were used as a substitute for the fixed wiring of a structure: a) Building three quality control lab: A VWR hotplate and a Thermo Scientific Super Nova Multiplace heater were powered by a power strip, on or about 10/12/11. b) Warehouse building two research lab "one gallon hood": Mettler Toledo and VWR hot plates were powered by a power strip, on or about 10/12/11. c) Warehouse building two research lab "five gallon hood": IKA mixers were powered by power strips, on or about 10/12/11. d) Warehouse building two boiler room: An extension cord was used to power a pump that operated a chiller, on or about 10/12/11. e) Warehouse building two quality control pre-polymer applications lab: A power strip was used to power a heat gun used with the distillation unit, on or about 10/12/11. f) Warehouse building two quality control pre-polymer applications lab: An extension cord was used to power a power strip that operated a distillation unit, on or about 10/12/11. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Translate