Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313754186
Citation: 01005
Citation Type: Serious
Abatement Status: I
Initial Penalty: $2,500.00
Current Penalty: $1,250.00
Issuance Date: 05/07/2010
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 05/12/2010
Gravity: 10
Report ID: 0214200
Contest Date: 05/27/2010
Final Order: 01/04/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/04/2012 | $1,250.00 | 05/12/2010 | Serious | |
| Penalty | Z: Issued | 05/07/2010 | $2,500.00 | 05/12/2010 | Serious |
Translate