Violation Detail
Standard Cited: 19100119 E03 I Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 01005
Citation Type: Serious
Abatement Status:
Initial Penalty: $5,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 9
Nr Exposed: 250
Abatement Date: 04/19/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | D: Govt Dismissed | 09/27/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 03/08/2010 | $5,000.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard: REFINERY
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazard s of the process: a.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the process hazard analysis for the napht ha treater furnaces addressed the loss of combustion for the process heater. b.B P-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employ er did not ensure the process hazard analysis for the Vac Furnace 1 C firebox di d not address the loss of combustion for the process heater. c.BP-Husky Refining , LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensur e the process hazard analysis involving the upper pumparound cooler (PR543576) addressed the lack of a pressure relief device to provide shel l side protection. d.BP-Husky Refining, LLC - Oregon, Ohio: On or about Septembe r 10, 2009, the employer did not ensure the process hazard analysis involving th e lower pumparound cooler (PR543757) addressed the lack of a pressure relief dev ice to provide shell side protection. e.BP-Husky Refining, LLC - Oregon, Ohio: O n or about September 10, 2009, the employer did not ensure the porocess hazard a nalysis involving the primary absorber lean oil coolers (PR543585) addressed the lack of a pressure relief device to provide shell side protection. f.BP-Husky R efining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did no t ensure the process hazed analysis involving the primary absorber lean oil coolers (PR543586) addressed the lack of a pressure relief device to pr ovide shell side protection. g.BP-Husky Refining, LLC - Oregon, Ohio: On or abou t September 10, 2009, the employer did not ensure the process hazard analysis in volving the stripper reboiler condensate pot (PR511134) addressed the lack of a pressure relief device to provide tube side protection. h.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the process hazard analysis involving the stripper steam reboiler (PR543538) addres sed the lack of a pressure relief device to provide tube side protection. i.BP-H usky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the process hazard analysis involving the stripper CHGO Reboiler (PR543539) addressed the lack of a pressure relief device to provide tu be side protection. In accordance with 29 CFR 1903.19(d), abatement certificatio n is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION W ORKSHEET), and in addition, documentation demonstrating that abatement is comple te must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photogr aphic or video evidence of abatement, or other written records.t,