Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 300631009
Citation: 01005
Citation Type: Serious
Abatement Status: I
Initial Penalty: $2,500.00
Current Penalty:
Issuance Date: 01/26/1999
Nr Instances: 4
Nr Exposed: 20
Abatement Date: 01/29/1999
Gravity: 10
Report ID: 0215800
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/17/1999 | 01/29/1999 | Serious | ||
| Penalty | Z: Issued | 01/26/1999 | $2,500.00 | 01/29/1999 | Serious |
Translate