Violation Detail
Standard Cited: 19100269 D02 V Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1821240.015
Citation: 01005
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 10/29/2025
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 12/17/2025
Gravity: 10
Report ID: 0317300
Contest Date: 12/04/2025
Final Order:
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 12/04/2025 | $16,550.00 | 12/17/2025 | Serious | |
| Penalty | Z: Issued | 10/29/2025 | $16,550.00 | 12/17/2025 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(d)(2)(v): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the provisions of paragraph (d) of this section were being followed: (a) Heat Recovery Steam Generator (HRSG) - On or about April 29, 2025, and at times prior thereto, the employer failed to perform and document the required annual inspection of HRSG-specific lockout/tagout procedures. The energy-control inspections conducted did not include HRSG drum isolation steps. As a result, long-standing deficiencies, such as missing vent identification, lack of step-by-step pressure verification, and absence of vacuum-relief instructions, were never identified or corrected. The failure to inspect and update these procedures annually allowed employees to perform drum-opening operations without confirmed zero-energy verification, exposing them to lethal vacuum and impact hazards.