Violation Detail
Standard Cited: 19260452 J02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 1799613.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,620.00
Current Penalty: $6,620.00
Issuance Date: 07/07/2025
Nr Instances: 2
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0216000
Contest Date: 07/17/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/18/2025 | $6,620.00 | Serious | ||
Penalty | Z: Issued | 07/07/2025 | $6,620.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. Location: 1 Ruth Court, Monsey, NY a) On or about January 09, 2025, employees utilizing a pump jack scaffold in the rear of the house to remove and replace siding on a two-story residential building did not secure the poles to the building by rigid triangular bracing or equivalent at the bottom. b) On or about January 09, 2025, employees utilizing a pump jack scaffold on the south side of the house to remove and replace siding on a two-story residential building did not secure the poles to the building by rigid triangular bracing or equivalent at the bottom. NOTE: Because abatement of this violation is already documented in the casefile, the employer need not submit certification nor documentation of abatement of this violation as normally required by 29 CFR 1903.19.