Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1763142.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,292.00
Current Penalty: $7,904.40
Issuance Date: 09/09/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/19/2024
Gravity: 10
Report ID: 0936300
Contest Date:
Final Order: 10/08/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/08/2024 | $7,904.40 | 09/19/2024 | Serious | |
Penalty | Z: Issued | 09/09/2024 | $11,292.00 | 09/19/2024 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: Waiting Room: Guard rails were not installed around all open sides of the working platform employees used to paint and apply skim coating to the ceiling beam exposing employees to fall hazards.