Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1760691.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,323.00
Current Penalty: $3,450.00
Issuance Date: 12/30/2024
Nr Instances: 1
Nr Exposed: 11
Abatement Date: 02/03/2025
Gravity: 1
Report ID: 0830500
Contest Date:
Final Order: 01/28/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/28/2025 | $3,450.00 | 02/03/2025 | Serious | |
Penalty | Z: Issued | 12/30/2024 | $5,323.00 | 02/03/2025 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: (a) On or about July 10, 2024, the employer did not ensure a rotating shaft end, located on the 5-Gallon Production Line conveyor system, which project greater than one-half the diameter. The shaft protruded approximately 3 1/8 inches from the conveyor system, with a diameter of apprimoximately1 1/8"1" in diameter", and was not guarded by a nonrotating cap or safety sleeve.