Violation Detail
Standard Cited: 19100269 J02 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1756460.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,292.00
Current Penalty: $9,598.20
Issuance Date: 12/17/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 01/13/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/13/2025 | $9,598.20 | Serious | ||
Penalty | Z: Issued | 12/17/2024 | $11,292.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(j)(2)(iii): Live-line tools used for primary employee protection were not removed from service every 2 years, and whenever required under paragraph (j)(2)(ii) of this section, for examination, cleaning, repair, and testing: (a) On or about 6/19/2024 -PGP gas distribution field Coaling, AL, the employer exposed employees to electrocution hazards when deenergizing and reenergizing distribution lines, in that, employees had access to live line tools that were not removed from service every two years.