Violation Detail
Standard Cited: 19100269 D02 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1749405.015
Citation: 01005
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 11/20/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/03/2024
Gravity: 10
Report ID: 0213100
Contest Date: 12/19/2024
Final Order:
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 12/19/2024 | $16,131.00 | 12/03/2024 | Serious | |
| Penalty | Z: Issued | 11/20/2024 | $16,131.00 | 12/03/2024 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(d)(2)(iii): Procedures were not developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section: (a) Mount Ida Hydro Station, Control room level: On or about May 21, 2024, employees conducting maintenance on an Allis Chalmers MA-250C circuit breaker in a 4160-volt switchgear housing experienced an arc flash when the breaker contacted an energized cell during racking-in. The employer did not have LOTO procedures developed or documented to perform racking-in/racking-out, or to shut down and deenergize the 4160-volt switchgear and breaker.
Translate