Violation Detail
Standard Cited: 19100212 A03 I General requirements for all machines.
Inspection Nr: 1716505.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,323.00
Current Penalty: $3,193.80
Issuance Date: 03/18/2024
Nr Instances: 2
Nr Exposed: 5
Abatement Date:
Gravity: 1
Report ID: 0522500
Contest Date:
Final Order: 04/03/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/03/2024 | $3,193.80 | Serious | ||
Penalty | Z: Issued | 03/18/2024 | $5,323.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.212(a)(3)(i): Point of operation is the area on a machine where work is actually performed upon the material being processed. a. On or about December 14, 2023, the G07 Schmitt stamping machine did not have guards in place to prevent employees from getting into the point of operation. b. On or about December 14, 2023, in the Assembly department, the presses were not fully guarded to prevent employees from getting into the point of operation.