Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1664064.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,250.00
Current Penalty: $4,700.00
Issuance Date: 10/11/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/30/2023
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 10/27/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/27/2023 | $4,700.00 | 10/30/2023 | Serious | |
| Penalty | Z: Issued | 10/11/2023 | $6,250.00 | 10/30/2023 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed. This violation was observed on or about April 17, 2023, exit routs are not kept free and unobstructed from storage and materials in the southeast corner of the shop. Pursuant to 29 CFR 1903.19, within (10) calendar days of the date of this citation, the employer must submit documentation describing the steps taken to ensure pathways leading to exits are maintained free from obstruction.
Translate