Violation Detail
Standard Cited: 19100303 G02 I General.
Inspection Nr: 1650835.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,595.00
Current Penalty: $6,876.00
Issuance Date: 03/31/2023
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 04/24/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/24/2023 | $6,876.00 | Serious | ||
Penalty | Z: Issued | 03/31/2023 | $8,595.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.303(g)(2)(i):Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): a) For the fabrication area, on or about 02/15/2023, The employer exposed employees to electrocution and burn hazards, in that, 110/220VAC live conductors were exposed at an air compressor.