Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1621917.015
Citation: 01005
Citation Type: Serious
Abatement Date: 03/23/2023 2
Initial Penalty: $5,358.00
Current Penalty: $2,925.00
Issuance Date: 03/13/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 04/12/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/12/2023 | $2,925.00 | 03/23/2023 | Serious | |
Penalty | Z: Issued | 03/13/2023 | $5,358.00 | 03/23/2023 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Location: 930 58th Street, Brooklyn, NY 11219 On or about: September 14, 2022 (a) The employer did not ensure that all working levels of scaffolds used by employees were fully planked between uprights; employees worked from a 1-tier tubular welded frame scaffold that was not fully planked between uprights.