Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.

Inspection Nr: 1575328.015

Citation: 01005

Citation Type: Serious

Abatement Status: Corrected During Inspection

Initial Penalty: $5,801.00

Current Penalty: $3,770.65

Issuance Date: 07/08/2022

Nr Instances: 1

Nr Exposed: 42

Abatement Date:

Gravity: 5

Report ID: 0214500

Contest Date:

Final Order: 08/10/2022

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 08/10/2022 $3,770.65   Serious  
Penalty Z: Issued 07/08/2022 $5,801.00   Serious  

Text For Citation: 01 Item/Group: 005 Hazard:

29 CFR 1910.305(b)(2)(i):Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) Warehouse Building interior: Junction boxes was missing a knockout, exposing employees to an electrical shock, on or about 1/25/22.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close