Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 1522085.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,778.00
Current Penalty: $5,266.80
Issuance Date: 05/25/2021
Nr Instances: 3
Nr Exposed: 3
Abatement Date: 07/13/2021
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 06/15/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2021 | $5,266.80 | 07/13/2021 | Serious | |
Penalty | Z: Issued | 05/25/2021 | $8,778.00 | 07/13/2021 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.217(c)(1)(i):It shall be the responsibility of the employer to provide and insure the usage of "point of operation guards" or properly applied and adjusted point of operation devices on every operation performed on a mechanical power press. a. On or about March 24, 2021, the employer did not ensure point of operation guarding was properly applied to the point of operation of the P2 Minister 45ton, part-revolution mechanical power press. b. On or about March 24, 2021, the employer did not ensure point of operation guarding was properly applied to the point of operation of the P3 Niagara, part-revolution mechanical power press. c. On or about March 24, 2021, the employer did not ensure point of operation guarding was properly applied to the point of operation of the P4 L&J, part-revolution mechanical power press.