Violation Detail
Standard Cited: 19261205 A
This violation item has been deleted.
Inspection Nr: 1485796.015
Citation: 01005
Citation Type: Serious
Abatement Date: 02/08/2021
Initial Penalty: $5,398.00
Current Penalty: $0.00
Issuance Date: 01/13/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 02/09/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/09/2021 | $0.00 | 02/08/2021 | Serious | |
Penalty | Z: Issued | 01/13/2021 | $5,398.00 | 02/08/2021 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.1205(a): Before entry was authorized, the employer did not document the completion of measures required by paragraph 1926.1204(c) of this standard by preparing an entry permit: On July 24, 2020, at this jobsite, the employer failed to document completion of measures as required by standard 1926.1204(c) via an entry permit, prior to allowing employees entry to a permit required confined space; manhole.