Violation Detail
Standard Cited: 19260451 F07 General requirements.
Inspection Nr: 1479381.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,048.00
Current Penalty: $2,428.80
Issuance Date: 06/23/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 07/23/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/23/2020 | $2,428.80 | Serious | ||
Penalty | Z: Issued | 06/23/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. On or about 6/11/2020, at jobsite located at 9500 SW 61st Ct, Pinecrest, FL 33156, employees were exposed to a fall hazard while plastering from tubular welded frame scaffolds that were erected without supervision, as evidenced by, among other conditions; scaffold was not fully planked; scaffold platforms were not adequately supported; scaffolds lacked of cross braces, etc.