Violation Detail
Standard Cited: 19100269 A02 I B Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1433397.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,630.00
Current Penalty: $4,641.00
Issuance Date: 03/09/2020
Nr Instances: 6
Nr Exposed: 6
Abatement Date: 04/24/2020
Gravity: 5
Report ID: 1050210
Contest Date:
Final Order: 04/06/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/06/2020 | $4,641.00 | 04/24/2020 | Serious | |
Penalty | Z: Issued | 03/09/2020 | $6,630.00 | 04/24/2020 | Serious |