Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1418026.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,934.00
Current Penalty: $7,100.00
Issuance Date: 11/01/2019
Nr Instances: 1
Nr Exposed: 120
Abatement Date: 11/21/2019
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 11/25/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/25/2019 | $7,100.00 | 11/21/2019 | Serious | |
Penalty | Z: Issued | 11/01/2019 | $11,934.00 | 11/21/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer did not develop piping and instrument diagrams for the equipment that was part of the process: On or about July 23, 2019, and times prior thereto, the employer failed to develop piping and instrument diagrams for the equipment that was part of the process. The employer processes over 10,000 lbs of an unscented flammable propane mixture for the production operation. The Employee(s) were exposed to the hazards associated with propane and butane such as burns, explosion and asphyxiation.