Violation Detail
Standard Cited: 19100305 G02 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1409418.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $8,000.00
Issuance Date: 09/26/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/08/2019
Gravity: 10
Report ID: 0936400
Contest Date:
Final Order: 10/24/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2019 | $8,000.00 | 10/08/2019 | Serious | |
Penalty | Z: Issued | 09/26/2019 | $13,260.00 | 10/08/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap: FIRE CONTROL PUMP ROOM-A flexible cord on a power strip was extended by a splice using wire nuts, exposing workers to electrocution hazards.