Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1325463.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,641.00
Current Penalty: $6,303.00
Issuance Date: 10/31/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 11/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2018 | $6,303.00 | Serious | ||
Penalty | Z: Issued | 10/31/2018 | $11,641.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.219(c)(4)(i): Projecting shaft ends did not present a smooth edge and end and projected more than one-half the diameter of the shaft and was not guarded by nonrotating caps or safety sleeves. a. Viking Paper Corporation located in Toledo, Ohio: On or about June 26, 2018, the employer did not ensure the projecting shaft end for the triple deck preheater was properly guarded.