Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1303803.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $5,000.00
Issuance Date: 09/18/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/15/2018
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 10/02/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/02/2018 | $5,000.00 | 10/15/2018 | Serious | |
Penalty | Z: Issued | 09/18/2018 | $6,467.00 | 10/15/2018 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) Production Area- On April 4, 2018, the employer failed to ensure that the open cover on the damaged disconnect box was repaired so that it could be closed. The disconnect box was within an assembly workstation near the Red Chop Saw. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.