Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1301931.015
Citation: 01005
Citation Type: Serious
Abatement Date: 10/09/2018
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 08/21/2018
Nr Instances: 3
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date: 09/12/2018
Final Order: 08/19/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/19/2020 | $0.00 | 10/09/2018 | Serious | |
Penalty | C: Contested | 09/14/2018 | $12,934.00 | 10/09/2018 | Serious | |
Penalty | Z: Issued | 08/21/2018 | $12,934.00 | 10/09/2018 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices (RAGAGAEP). a. The employer did not document that it complied with its chosen recognized and generally accepted good engineering practice (RAGAGAEP) (ASHRAE 15, 2010, Section 8.11.2 and 8.12 b and IIAR 2008 addendum B Section13.1.10.1 ) when it failed to ensure that machinery room (north door) had a tight fitting door that opened outward. b. The employer did not document that it complied with its chosen recognized and generally accepted good engineering practice (RAGAGAEP) (ASHRAE 15, 2010, (Section 9.7.8.2 b) when it failed to ensure that where pressure relief devices discharge to a water tank, the water shall be prevented from freezing. c. The employer did not document that it complied with its chosen recognized and generally accepted good engineering practice (RAGAGAEP) (ASHRAE 15, 2010, (Section 8.11.2 and 8.12 f and IIAR 2008 addendum B Sections 13.1.1.3 and 13.1.1.6 ) when it failed to seal openings in the walls in the engine room through which pipes pass.