Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1295251.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $2,500.00
Issuance Date: 08/15/2018
Nr Instances: 4
Nr Exposed: 12
Abatement Date: 01/06/2021
Gravity: 10
Report ID: 0524530
Contest Date: 09/05/2018
Final Order: 01/06/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/06/2020 | $2,500.00 | 01/06/2021 | Serious | |
Penalty | C: Contested | 09/07/2018 | $5,174.00 | 10/02/2018 | Serious | |
Penalty | Z: Issued | 08/15/2018 | $5,174.00 | 10/02/2018 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: The employer did not ensure that the projecting shaft ends of the belt sanding/grinding stations were guarded, presented smooth edges, and/or projected less than one-half the diameter of the shaft.