Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1252016.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,889.00
Current Penalty: $2,975.00
Issuance Date: 10/26/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/09/2017
Gravity: 1
Report ID: 0625400
Contest Date:
Final Order: 11/30/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/30/2017 | $2,975.00 | 11/09/2017 | Serious | |
Penalty | Z: Issued | 10/26/2017 | $4,889.00 | 11/01/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: On or about August 3, 2017, and in times prior thereto, The ground prong was missing on an red, three outlet extension cord, located in the small mixer area.