Violation Detail
Standard Cited: 19260451 G04 IV General requirements.
Inspection Nr: 1244918.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $6,844.00
Issuance Date: 12/07/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/04/2018
Gravity: 10
Report ID: 0316300
Contest Date:
Final Order: 12/20/2017
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2017 | $6,844.00 | 01/04/2018 | Serious | |
| Penalty | Z: Issued | 12/07/2017 | $11,408.00 | 01/04/2018 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.451(g)(4)(iv): Midrails were not installed at a height approximately midway between the top edge and of the guardrail system and the platform surface. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to scaffolding that was missing a midrail approximately midway between the top edge of the guardrail system and the platform surface. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.