Violation Detail
Standard Cited: 19100178 A04 Powered industrial trucks.
Inspection Nr: 1218663.015
Citation: 01005
Citation Type: Serious
Abatement Date: 08/02/2017 2
Initial Penalty: $7,696.00
Current Penalty: $5,387.20
Issuance Date: 06/15/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 07/11/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/11/2017 | $5,387.20 | 08/02/2017 | Serious | |
Penalty | Z: Issued | 06/15/2017 | $7,696.00 | 08/02/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation shall not be performed by the customer or user without manufacturers prior written approval. Capacity, operation, and maintenance instruction plates, tags, or decals shall be changed accordingly. a. Warehouse: On or about March 21, 2017, employee were exposed to fall hazards, in that prior written approval had not been obtained for the addition of the personnel platform and guardrails on the cherry picker.