Violation Detail
Standard Cited: 19260416 A03 General requirements.
This violation item has been deleted.
Inspection Nr: 1204690.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 07/19/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/09/2017
Gravity: 10
Report ID: 0627510
Contest Date: 08/09/2017
Final Order: 11/20/2017
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/20/2017 | $0.00 | 08/09/2017 | Serious | |
Penalty | C: Contested | 08/09/2017 | $12,675.00 | 08/09/2017 | Serious | |
Penalty | Z: Issued | 07/19/2017 | $12,675.00 | 08/09/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into pysical or electrical contact with the electric power circuit: On or about January 21, 2017 and times prior thereto, the employer did not ascertain a circuit was de-energized prior to employees installing a disconnect plug in the electrical room on the second floor and exposed them to electrical shock and arc flash/blast hazards.