Standard Cited: 19100333 B02 IV Selection and use of work practices
Inspection Nr: 1204162.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,926.00
Current Penalty: $4,000.00
Issuance Date: 06/26/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/25/2018
Gravity: 5
Report ID: 0627500
Contest Date: 07/20/2017
Final Order: 06/25/2018
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/25/2018 | $4,000.00 | 06/25/2018 | Serious | |
| Penalty | C: Contested | 08/07/2017 | $6,926.00 | 07/07/2017 | Serious | |
| Penalty | Z: Issued | 06/26/2017 | $6,926.00 | 07/07/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.333(b)(2)(iv): The employer did not properly verify if the components were positively de-energized or in an otherwise safe condition to protect the employees from an electrical shock hazard. At the substation: On or about January 19, 2017, the employer did not verify equipment was positively de-energized. Employees were exposed to electrical shock hazards.