Violation Detail
Standard Cited: 19261203 H03 I
Inspection Nr: 1196803.015
Citation: 01005
Citation Type: Other
Abatement Date: 04/20/2018 2
Initial Penalty: $12,675.00
Current Penalty: $5,000.00
Issuance Date: 06/02/2017
Nr Instances: 3
Nr Exposed: 7
Related Event Code (REC):
Gravity:
Report ID: 0627700
Contest Date: 06/28/2017
Final Order: 04/20/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/20/2018 | $5,000.00 | 04/20/2018 | Other | |
Penalty | C: Contested | 08/03/2017 | $12,675.00 | 06/12/2017 | Serious | |
Penalty | Z: Issued | 06/02/2017 | $12,675.00 | 06/12/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.1203(h)(3)(i): Before entry operations begin each entry employer did not obtain all of the controlling contractor's information regarding permit space hazards and entry operation: On or about December 09, 2016 and at times prior thereto, the entry employer did not obtain all of the controlling contractor's information regarding permit space hazards and entry operation. Employees were exposed to the hazard of being struck by falling dried asphalt.