Standard Cited: 19100333 B02 IV B Selection and use of work practices
Inspection Nr: 1184995.015
Citation: 01005
Citation Type: Serious
Abatement Date: 04/30/2017 2
Initial Penalty: $12,675.00
Current Penalty: $7,675.00
Issuance Date: 03/24/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 04/18/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2017 | $7,675.00 | 04/30/2017 | Serious | |
Penalty | Z: Issued | 03/24/2017 | $12,675.00 | 04/12/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked on as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed, and did not verify that the circuit elements and equipment parts had been deenergized. Table Talk Pies, 28 Bowditch Dr., Shrewsbury, Massachusetts; On and before October 19, 2016, employees did not verify electrical equipment was deenergized using a meter or other test equipment, prior to performing work on or near electrical circuits or equipment, such as electrical panels or Kliklok machines.