Violation Detail
Standard Cited: 19260416 B01 General requirements.
This violation item has been deleted.
Inspection Nr: 1183794.015
Citation: 01005
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 04/06/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 05/02/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/02/2017 | $0.00 | Serious | ||
Penalty | Z: Issued | 04/06/2017 | $9,054.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.416(b)(1): The employer did not ensure that barriers or other means of guarding shall be provided to assure that work space for electrical equipment will not be used as a passageway during periods when energized parts of electric equipment are exposed: a) The employer did not have the aisle/work are barricaded to keep the passageway clear when energized electric panels DPH-40B-2 and 40-B-4 were being worked in. An arc flash occurred while work was being done in the energized panels. Location: 388 Greenwich St, New York, N.Y., 40th fl mechanical rm. On or about 10/08/2016 NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS ITEM IN ACCORDANCE WITH 29 CFR 1903.19.