Violation Detail
Standard Cited: 19260416 B01 General requirements.
This violation item has been deleted.
Inspection Nr: 1183794.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 04/06/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 05/02/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/02/2017 | $0.00 | Serious | ||
| Penalty | Z: Issued | 04/06/2017 | $9,054.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.416(b)(1): The employer did not ensure that barriers or other means of guarding shall be provided to assure that work space for electrical equipment will not be used as a passageway during periods when energized parts of electric equipment are exposed: a) The employer did not have the aisle/work are barricaded to keep the passageway clear when energized electric panels DPH-40B-2 and 40-B-4 were being worked in. An arc flash occurred while work was being done in the energized panels. Location: 388 Greenwich St, New York, N.Y., 40th fl mechanical rm. On or about 10/08/2016 NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS ITEM IN ACCORDANCE WITH 29 CFR 1903.19.
Translate