Violation Detail
Standard Cited: 19100036 A05 Design and construction requirements for exit routes.
Inspection Nr: 11741980
Citation: 01005
Citation Type: Other
Abatement Status: X
Initial Penalty: $65.00
Current Penalty: $65.00
Issuance Date: 07/19/1975
Nr Instances: 2
Nr Exposed:
Abatement Date: 07/24/1975
Gravity:
Report ID: 0215000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate