Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1165614.015
Citation: 01005
Citation Type: Other
Abatement Date: 07/05/2017 2
Initial Penalty: $11,408.00
Current Penalty: $3,000.00
Issuance Date: 01/26/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0524200
Contest Date:
Final Order: 03/01/2017
Emphasis:
Substance: 2150
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/01/2017 | $3,000.00 | 07/05/2017 | Other | |
Penalty | Z: Issued | 01/26/2017 | $11,408.00 | 04/05/2017 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment. a) Pinnacle Propane Express, LLC - On or about July 28, 2016, the employer failed to ensure that written procedures were established and implemented for the testing and inspection of the container filling carrousel.