Violation Detail
Standard Cited: 19261204 E01 I
Inspection Nr: 1152688.015
Citation: 01005
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $8,730.00
Current Penalty: $5,238.00
Issuance Date: 11/16/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/06/2016
Gravity: 10
Report ID: 0625700
Contest Date: 12/05/2016
Final Order: 03/07/2017
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/07/2017 | $5,238.00 | 12/06/2016 | Serious | |
Penalty | C: Contested | 12/15/2016 | $8,730.00 | 12/06/2016 | Serious | |
Penalty | Z: Issued | 11/16/2016 | $8,730.00 | 12/06/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.1204(e)(1)(i): (i) Each entry employer must perform pre-entry testing to the extent feasible before entry is authorized; On or about 05/17/2016, at 3600 Dick Taylor Street, Monroe, LA, employees were conducting sewer repairs in a sewer manhole and the employer failed to perform pre-entry testing of the atmosphere before employees entered the manhole.