Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1147532.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,236.00
Current Penalty: $6,236.00
Issuance Date: 10/27/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/23/2016
Gravity: 5
Report ID: 0213900
Contest Date: 11/16/2016
Final Order: 08/26/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/26/2021 | $6,236.00 | 11/23/2016 | Serious | |
Penalty | C: Contested | 01/31/2017 | $6,236.00 | 11/23/2016 | Serious | |
Penalty | Z: Issued | 10/27/2016 | $6,236.00 | 11/23/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Mill department: The employer did not conduct periodic inspections of energy control procedures annually for equipment that was serviced or maintained by employees, such as, but not limited to calendar machine, on or about 5/16/16. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.