Violation Detail
Standard Cited: 19100333 A01 Selection and use of work practices
Inspection Nr: 1128049.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $6,000.00
Issuance Date: 06/29/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/12/2016
Gravity: 10
Report ID: 0522500
Contest Date: 07/21/2016
Final Order: 03/16/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/16/2018 | $6,000.00 | 07/12/2016 | Serious | |
| Penalty | C: Contested | 07/28/2016 | $7,000.00 | 07/12/2016 | Serious | |
| Penalty | Z: Issued | 06/29/2016 | $7,000.00 | 07/12/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.333(a)(1): "Deenergized parts." Live parts to which an employee may be exposed shall be deenergized before the employee works on or near them, unless the employer can demonstrate that deenergizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations. Live parts that operate at less than 50 volts to ground need not be deenergized if there will be no increased exposure to electrical burns or to explosion due to electric arcs. Note 1: Examples of increased or additional hazards include interruption of life support equipment, deactivation of emergency alarm systems, shutdown of hazardous location ventilation equipment, or removal of illumination for an area. Note 2: Examples of work that may be performed on or near energized circuit parts because of infeasibility due to equipment design or operational limitations include testing of electric circuits that can only be performed with the circuit energized and work on circuits that form an integral part of a continuous industrial process in a chemical plant that would otherwise need to be completely shut down in order to permit work on one circuit or piece of equipment. Note 3: Work on or near deenergized parts is covered by paragraph (b) of this section: a. On or about April 6, 2016, two Sunfield employees were observed performing work inside a 480 volt electrical panel (the control box for the weld side K-5 press) without deenergizing the equipment. Due to this condition, employees were exposed to live electrical parts and associated hazards.