Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1119628.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 03/16/2016
Nr Instances: 4
Nr Exposed: 3
Abatement Date: 05/02/2016
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 04/06/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/06/2016 | $4,200.00 | 05/02/2016 | Serious | |
Penalty | Z: Issued | 03/16/2016 | $7,000.00 | 05/02/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Coating Department: On, or about, January 18, 2016, specific procedures had not been developed to identify all of the power sources that fed the control consoles for Coaters 1, 2, 3 and 4. Each console was fed by multiple circuits.