Violation Detail
Standard Cited: 19100219 I01 Mechanical power-transmission apparatus.
Inspection Nr: 1115789.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,600.00
Issuance Date: 06/30/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/11/2016
Gravity: 10
Report ID: 0213600
Contest Date: 07/25/2016
Final Order: 03/03/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/03/2017 | $5,600.00 | 07/11/2016 | Serious | |
| Penalty | C: Contested | 07/26/2016 | $7,000.00 | 07/11/2016 | Serious | |
| Penalty | Z: Issued | 06/30/2016 | $7,000.00 | 07/11/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.219(i)(1): Screw(s) or bolt(s) used in revolving collar(s) projected beyond the largest periphery of the collar: a) On or about 01/06/16, in the Coal Handling Building, a metal collar installed to keep the shaft from traveling off the pulley was secured by two threaded bolts that projected beyond the largest periphery of the metal collar. ABATEMENT DOCUMENTATION REQUIRED