Violation Detail

Standard Cited: 19100303 B06 General.

Inspection Nr: 1101525.015

Citation: 01005

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $6,000.00

Issuance Date: 04/26/2016

Nr Instances: 27

Nr Exposed: 103

Abatement Date: 11/30/2016

Gravity: 10

Report ID: 0729700

Contest Date:

Final Order: 05/18/2016

Related Event Code (REC): C

Emphasis:

Substance: 2310


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty P: Petition to Mod Abatement $6,000.00 11/30/2016 Serious  
Penalty I: Informal Settlement 05/18/2016 $6,000.00 07/11/2016 Serious  
Penalty Z: Issued 04/26/2016 $7,000.00 06/09/2016 Serious  

Text For Citation: 01 Item/Group: 005 Hazard:

29 CFR 1910.303(b)(6): Conductors or equipment were located in damp or wet locations; where exposed to gases, fumes, vapors, liquids, or other agents that had a deteriorating effect on the conductors or equipment; or where exposed to excessive temperatures and were not identified for use in the operating environment: The employer is failing to protect employees working in the formation and battery charging rooms. This was most recently documented where employees were exposed to electrical shock and burn hazards in that electrical equipment was not installed for use in areas where sulfuric acids were present for the following pieces of equipment: a) 240 volt AC Formation Filler Pump Motor Controller located in the center of the main formation line near the eye wash. b) 240 volt AC Formation Filler Pump Main control box and disconnect located in the center of the main formation line near the eye wash adjacent (to the east) of the AC Formation Filler Pump Motor Controller c) 240 volt AC Motor Control Panel for ?Lake Warren? located just to the north side of the ?Lake Warren? pit. d) 480 volt AC Breaker Panel ?W? mounted on the wall between ?Lake Warren? and the Charging Room. e) 208 volt AC breaker panel ?WW? mounted on the wall between ?Lake Warren? and the Charging Room. f) 208 volt AC breaker panel ?ZZ? mounted on the wall between ?Lake Warren? and the Charging Room. g) 480 volt AC motor control panel MCC #1 and corresponding 10 motor controller/disconnect switches of MCC #1 mounted on the wall between ?Lake Warren? and the Charging Room. h) 120 volt AC electrical outlets mounted on the wall between ?Lake Warren? and the Charging Room just to the west of MCC #1. i) 480 volt AC PH Control box motor controller mounted on the wall between the east and west charging rooms near the water treatment pit. j) 480 volt AC disconnect box between the PH Control Box motor controller and the 240 volt AC breaker panel ?DDD? mounted on the wall between the east and west charging rooms near the water treatment pit. k) 240 volt AC breaker panel ?DDD? mounted on the wall between the east and west charging rooms near the water treatment pit. l) 480/240 volt electrical box above the 240 volt AC breaker panel ?DDD? mounted on the wall between the east and west charging rooms near the water treatment pit. m) 480 volt disconnect for the ?Northwest Pump? mounted on the wall between the east and west charging rooms near the water treatment pit. n) 480 volt AC panel ?P-2? mounted on the wall between the east and west charging rooms near the water treatment pit. o) 480 volt AC disconnect for the ?south pump disconnect? mounted on the wall between the east and west charging rooms near the water treatment pit. p) 480 volt AC disconnect for the ?east pump? mounted on the wall between the east and west charging rooms near the water treatment pit. q) 480 volt AC disconnect for the ?main cooling tower? mounted on the wall between the east and west charging rooms near the water treatment pit. r) 480 volt AC disconnect for the ?cooling fan #4? mounted on the wall between the east and west charging rooms near the water treatment pit. s) 480 volt AC disconnect for the ?cooling fan #3? mounted on the wall between the east and west charging rooms near the water treatment pit. t) 480 volt electrical box above the disconnect for the ?cooling fan #4? mounted on the wall between the east and west charging rooms near the water treatment pit. u) 480 volt electrical box above the disconnect for the ?cooling fan #3? mounted on the wall between the east and west charging rooms near the water treatment pit. v) 480 volt electrical disconnect to the right of the ?cooling fan #3? disconnect mounted on the wall between the east and west charging rooms near the water treatment pit. w) 480 volt electrical disconnect under the electrical box labeled ?#4? mounted on the wall between the east and west charging rooms near the water treatment pit. x) 480 volt electrical disconnect ?D4A? mounted on the wall between the east and west charging rooms near the water treatment pit. y) 480 volt electrical disconnect ?D4B? mounted on the wall between the east and west charging rooms near the water treatment pit. z) 480 volt electrical disconnect ?cooling tower fans? mounted on the wall between the east and west charging rooms near the water treatment pit. aa) 480 volt motor control panel ?cascade pit? mounted on the wall between the east and west charging rooms near the water treatment pit.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.