Violation Detail
Standard Cited: 19100119 E03 V Process safety management of highly hazardous chemicals.
Inspection Nr: 1082421.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $3,000.00
Issuance Date: 02/04/2016
Nr Instances: 1
Nr Exposed: 45
Abatement Date: 06/30/2016
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 02/25/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/25/2016 | $3,000.00 | 06/30/2016 | Serious | |
Penalty | Z: Issued | 02/04/2016 | $4,900.00 | 03/18/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting: a) Establishment - PEEB Process The 2013 PHA did not address potential ethyl chloride vapor cloud explosion over pressure impact on site equipment, buildings & personnel. Scenarios in the 2008 TCPA risk assessment calculated boundaries of 1, 2.3 and 5 psi over pressure waves but an evaluation of the on site consequences of the over pressure was not conducted. Violation occurred on or about 8/4/2015.