Violation Detail
Standard Cited: 19261420 B
This violation item has been deleted.
Inspection Nr: 1080311.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $0.00
Issuance Date: 12/31/2015
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 01/11/2016
Gravity: 10
Report ID: 0111400
Contest Date: 01/27/2016
Final Order: 05/30/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/30/2017 | $0.00 | 01/11/2016 | Serious | |
| Penalty | C: Contested | 01/29/2016 | $6,300.00 | 01/11/2016 | Serious | |
| Penalty | Z: Issued | 12/31/2015 | $6,300.00 | 01/11/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.1420(b): Signal transmission was not through a dedicated channel: Location: Jobsite An employee suffered fatal injuries on the jobsite where a precast concrete panel fell where a dedicated channel was not used.
Translate