Standard Cited: 19100147 D05 II The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1070025.015
Citation: 01005
Citation Type: Serious
Abatement Status:
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 12/09/2015
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 12/31/2015
Gravity: 10
Report ID: 0626000
Contest Date: 12/29/2015
Final Order: 08/31/2016
Related Event Code (REC): A
Emphasis:
Substance: 1440
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/31/2016 | $0.00 | 12/31/2015 | Serious | |
| Penalty | C: Contested | 02/04/2016 | $7,000.00 | 12/31/2015 | Serious | |
| Penalty | Z: Issued | 12/09/2015 | $7,000.00 | 12/31/2015 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.147(d)(5)(ii): Where there was a possibility of re-accumulation of stored energy to a hazardous level, verification of isolation was not continued until the servicing or maintenance was completed, or until the possibility of such accumulation did not exist: On June 10, 2015, the employer did not verify the isolation of hydrogen cyanide until the possibility of such accumulation did not exist during installation and removal of blinds from process piping at the Heads Column, DA-0501 at the Ineos Nitrile, Green Lake facility.