Standard Cited: 19100269 L06 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1591733.015
Citation: 01004E
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/24/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/15/2022
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 09/19/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/19/2022 | $0.00 | 09/15/2022 | Serious | |
Penalty | Z: Issued | 08/24/2022 | $0.00 | 09/15/2022 | Serious |
Text For Citation: 01 Item/Group: 004E Hazard:
29 CFR 1910.269(l)(6)(iii): When lines or equipment are connected to or disconnected from energized circuits, an employee did not keep loose conductors away from exposed energized parts. On or about March 22, 2022, and at times prior thereto employees did not keep loose conductors away from exposed energized lines or parts.