Violation Detail
Standard Cited: 19261427 B02
This violation item has been deleted.
Inspection Nr: 1673239.015
Citation: 01004D
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/16/2023
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/13/2023
Gravity: 10
Report ID: 0830400
Contest Date:
Final Order: 12/05/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/05/2023 | $0.00 | 12/13/2023 | Serious | |
Penalty | Z: Issued | 11/16/2023 | $0.00 | 12/13/2023 | Serious |
Text For Citation: 01 Item/Group: 004D Hazard:
29 CFR 1926.1427(b)(2): The trainer did not continuously monitor the operator-in-training on site while operating equipment: (a)Henry Carlson Construction, LLC at 1508 West 22nd Street, Sioux Falls, SD 57105: On or about and at times prior to May 25, 2023, the controlling employer did not ensure a trainer was provided and continuously monitored the operator-in-training. An operator-in-training was operating the Liebherr 550 HC40, 20-ton tower crane and was allowed to operate the tower crane without a trainer that would monitor and prevent a hazardous conditions related to improper operation. This condition exposed employees and subcontractor employees to falls, crushing, and struck-by hazards.