Violation Detail
Standard Cited: 19100094 A04 I B Ventilation.
Inspection Nr: 1280191.015
Citation: 01004D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/23/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/13/2018
Gravity: 5
Report ID: 0523300
Contest Date:
Final Order: 06/15/2018
Related Event Code (REC):
Emphasis:
Substance: 9130
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2018 | $0.00 | 07/13/2018 | Serious | |
Penalty | Z: Issued | 05/23/2018 | $0.00 | 07/13/2018 | Serious |
Text For Citation: 01 Item/Group: 004D Hazard:
29 CFR 1910.94(a)(4)(i)(b): The static pressure drop at the exhaust ducts leading from the equipment shall be checked when the installation is completed and periodically thereafter to assure continued satisfactory operation. Whenever an appreciable change in the pressure drop indicates a partial blockage, the system shall be cleaned and returned to normal operating condition. On or about December 12, 2017, building 8 abrasive blast room exhaust ventilation static pressure drops at the exhaust duct were not periodically checked.