Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1719998.015
Citation: 01004C
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/05/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/02/2024
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 06/20/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2024 | $0.00 | 07/02/2024 | Serious | |
Penalty | Z: Issued | 06/05/2024 | $0.00 | 07/02/2024 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: On or about December 31, 2023, at the Mainline No. 2 Core Station, PA-134, employees performed servicing and maintenance activities such as, but not limited to, adjusting the chain on the top of the sprocket of the hoist table, without affixing lockout or tagout devices to each energy isolating device.