Violation Detail
Standard Cited: 19100147 C07 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1550498.015
Citation: 01004C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,144.00
Current Penalty: $0.00
Issuance Date: 02/09/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/03/2022
Gravity: 5
Report ID: 0523300
Contest Date: 03/08/2022
Final Order: 07/05/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/05/2022 | $0.00 | 03/03/2022 | Serious | |
Penalty | C: Contested | 03/09/2022 | $4,144.00 | 03/03/2022 | Serious | |
Penalty | Z: Issued | 02/09/2022 | $4,144.00 | 03/03/2022 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.147(c)(7)(i):The employer did not provide adequate training to ensure that employees acquired the knowledge and skills required for the safe application, usage and removal of energy control devices: On or about August 30, 2021, the employer did not provide adequate training to ensure that employees acquired the knowledge and skills required for the safe application, usage and removal of energy control devices while clearing jams from the Newman S-282 Planer Machine (S/N 14606) or lubricating chains in the Boiler Room Pit and Room under the Silo.